M/V “ER HAMBURG” bow reconstruction project

The ship M/V “ER HAMBURG” was engaged in a head-on collision with a rock, North of Antikythira Island, resulting in severe deformation of the whole bow construction. Together with SNC ShipDesign, NASDIS was involved in the detailed design (Tribon model and workshop drawings) required for the renewal of almost the entire forward part.